A History of the Joplin Union Depot – Part IV

Catch up on the previous installments of a History of the Joplin Union Depot with Part 1, Part 2, and Part 3.

Joplin Union Depot

By mid-August a concrete mixer had been put to work at the site of the depot. The concrete it produced was immediately used to build piers sunk into the earth upon which the rest of the foundation and depot structure was to be supported. The workers, twenty teams in all, enjoyed unsually cool weather and as a result, progress delayed by earlier heat, pushed forward rapidly. Placed about the construction area were multiple piles of gravel, lumber and other construction material. Despite the mostly finished job of leveling the Kansas City Bottoms, the actual depot site was still undergoing a lowering of high places and a raising of low places.

Officials were optimistic over the progress being made throughout the month of August and “expressed every confidence of its [the depot] completion before midwinter.” Indeed, as smooth as the work had become, the depot was expected to be completed by the spring of 1911. All seemed to be in place, the material, and ever more men, Joplin men, the papers noted, were being hired. The laying of the corner stone was estimated to happen at the start of October.

At the same time, not far from the construction site, a Kansas City Southern engine and flat car were put to use in laying down tracks for the new rail yard. The track laying continued elsewhere with spurs built that extended to Broadway, as well to the electric railway that linked to the trolley systems of Joplin and Southwest Missouri. Another train put to work in the construction phase was made up of ten “dump cars” pulled by “the latest types of heavy locomotives.” A newspaper described the process, “Train, engines and all were put to work at once hauling dirt from the steam shovel, working southeast of town to the site of the yards.” At the yards, the soil was used to permanently flatten out the area of the tracks. As with the depot, itself, everything was progressing quickly.

The process continued into September. The location southeast of town, identified now as Saginaw, continued to supply dirt for the yards in trip after trip by the dump cars. The supplied dirt was then driven over by an engine leveler to flatten it further. The yards also demanded other sacrifices of the land, as a bluff just south of a North Main Street bridge was dynamited on a daily basis to make room for further yard space. By the 6th of September, the bluff was gone, as well numerous trees, shrubs, and odd pieces of trash, cleaned from the Bottom space between Main Street and the Kansas City Southern tracks. Thus, it was a surprise a few days later when at 8 AM on a Friday morning, the entirety of the carpentry crew, twenty-eight men in all, walked off the job.

The strike was in reaction to the failure of the contractors to hire union hod carriers. Hod carriers had the specific task of carrying supplies to bricklayers, plasterers, and other similar jobs around a construction site. Prior to the start of construction, an agreement, likely informal, had been made to use only union men on the building of the depot, itself. The carpenters, who had “quietly laid down their hammers and tools and quit the building,” were members of the Building Trades Council. Rumors were gossiped that the contractors intended to have an “open” shop at the depot site, the intention to hire non-union men, and therefore, avoid having to follow the regulations and rules that local unions demanded. The contractors, meanwhile, claimed that there were simply not enough union hod carriers available due to other construction efforts in Joplin.

A photograph of a hod carrier from the Library of Congress. These men played the important role of transporting required building materials to the craftsmen.

The head of the union’s local chapter, Albert H. Monteith, stated, “When the carpenters went to work on the depot it was their understanding that the whole job would be unionized…we went to work on this job a little over two weeks ago, well aware of the fact that some non-union labor was being used, but we were under the impression that our contentions would be met without delay and we would have as fellow workmen nothing but union men.” Monteith went on to add of the superintendent of the build, “[he] knew what action would take if he failed to take steps toward unionizing the whole job, and we gave him nearly three weeks in which to do his part, but when it became evident today that he would not recognize the union hod-carriers and other union building laborers, we quit.”

Monteith noted that union men were used at other construction sites of the Manhattan Construction Company, and if needed, they would undoubtedly strike in support of their Joplin brethren. The seriousness of the strike was great enough to stir rumors that the president of the company himself, President Looman, was on a train for Joplin to speak with the union men. If the president of the company visited Joplin, the papers failed to note his coming and going, but the strike did end approximately a week after it began. The resolution arrived when both parties came together and agreed that the conflict was in essence, a misunderstanding. The work reserved for union men would be reserved for union men, and the work done by non-union men would be done by non-union men. The clock was turned back pre-strike and all efforts once again pushed toward the completion of the depot.

A sense of urgency to complete the depot before the partnership of railroads laid the last of their tracks into the depot area became stronger as September came to a conclusion. An article published at the time looked ahead to its completion and touched upon its future beauty, “The architecture is of the mission style, and when completed the depot undoubtedly will be one of the handsomest, as well as one of the most unique structures of the kind in the country.” Flower beds and grass were to be noted improvements for the space between the depot and the nearest street. Its construction, reinforced concrete, the paper claimed, “is considered better building material than steel.” By the end of October it was hoped that the carpenters who had recently gone on strike would be at work on the interior.

Tower of Union Depot

The depot since it's construction has always had one apparent tower, featured here. It may be the two towers described were upon completion formed into one larger tower.

October was also a time of great focus on the innovative use of reinforced concrete. The work of building with the new material had been virtually completed in the basement, as well the exterior walls of the ground and second floors. 30 to 40 days, it was claimed, would be all it would take to finish the cement work at the depot. 40 days later, the focus was no longer on the cement, but two “massive towers” being erected above the depot. The work, described as, “exceedingly dangerous” involved the raising of huge frameworks of scaffolding to ensure success. The construction of the depot at that point in November 1910 involved the labor of over 300 men.

Work continued uninterrupted through November and December until bitter winter weather brought construction to a sudden halt in the first week of 1911. In addition to cold weather, that January brought the annual special edition from the Joplin News Herald, which took time to extoll the construction of the depot. “Erection of $90,000 Union Depot Transforms Topography of Dreary Sweep of Land in Kansas City Bottoms,” read the headline along with a copy of the architect’s rendering of the depot from the year before. In its braggadocio of the depot’s transformation, the article offers a glimpse of how Joplin saw the Kansas City Bottoms:

The architectural drawing of the Depot.

“Union Depot construction in Joplin has brought great change to the topographical appearance of a big acreage that for years was a dreary waste of abandoned mining gouges and slimy flat lands, the mire of the swamps growing rank with weeds and vines. One of the first steps in the grading of the union depot grounds, consisting of about 30 acres, was to change the course of Joplin Creek, an ill-smelling drainage channel, that twisted through the rank undergrowth, marking a zone of desolation through the very heart of the big tract which since has been filled in hundreds of thousands of cubic yards of earth and rock…”

“…Here, in the early days — and even later — twinkled the crimson lights of a mining camp’s tenderloin. For years and years this portion of the city was notorious, but with the coming of the union depot, every house, every shack — dilapidated on the exterior, but gorgeously furnished on the inside — every landmark that would remind one of the free and easy epoch of Joplin’s “North End” have been eradicated.”

The article also offered a description of the new area and what it meant to Joplin:

“Today the lower portion of the union depot grounds, where the station, the sheds, the turntable and the shops will be located, is as level as a checker board and as red as an orange, the fresh red clay, when viewed from a distance, resembling a soft velvet rug of mammoth dimensions. The ground slopes upward to Main street on the west and to Broadway on the south…”

“Joplin can hardly realize that the union depot is at last a reality. For years the city had dreamed of a union depot, but it seemed an endless period before the first spadeful of earth was turned. Since work started, however, progress has been swift and a big force of workmen has been employed steadily. The ring of the hammer has been constant.”

And finally, a full description of the depot’s beauty and attributes:

“ The station proper, which is of old Roman type, antedating the classic style, is constructed of plain and re-enforced concrete throughout, with oak finish. The floors are of concrete, with plain and Terrazo finish. The walls and roof are of concrete, the exterior being finished with white Portland cement, stippled, which produces a very pleasing effect.

The main part of the building is occupied by the general waiting room, women’s and men’s, waiting room and ticket office. The structure is two stories in height. The north wing provides express and baggage room, the south wing being occupied by dining room and lunch and kitchen. All modern equipment is to be installed, and the station is to be ready for use within a few weeks, although the completion of the train sheds, the round house, and other structures and equipment will require a much longer time.”

The future of the depot was bright in the first month of 1911 and the months ahead promised its completion. At the same time, Joplin continued its advancement as a city bursting with pride and progress.

Tune in for fifth and final installment of the history of the Joplin Union Depot in the near future!

A History of the Joplin Union Depot – Part III

Catch up on the history of the Joplin Depot’s origins with part one here and part two here.

The first view of the Union Depot which greeted the readers of the Joplin News Herald on March 1st

After the exciting publication of an architect’s drawing of the Union Depot on the first day of March, 1910, a debate may have erupted over the validity of the print.  The News Heraldon the 28th of March, in one of the first updates on the depot since the beginning of the month, confirmed the accuracy with the arrival of the official plans and specifications to the city engineer’s office.  The city engineer, J.B. Hodgdon, passed on the plans to several local contractor firms.  It was the hope that a local firm would offer a satisfactory bid, such as Dieter and Wenzel, located in nearby Carthage and a company responsible for raising many of Joplin’s most well known buildings.  Notably, the city planned to divide the construction process between building the depot structure and grading the land about the building.  The land in question, the Kansas City Bottoms, located between Main Street and the Kansas City Southern tracks and between Joplin Creek and Broadway, was to be leveled.

Two days later, the papers announced the appointment of E.F. Cameron as the local attorney for the Joplin Union Depot.  The announcement was accompanied by a firm statement that construction would start April 1.  In the meanwhile, the parties behind the depot had finalized the acquisition of properties within the desired realm of the depot and exploratory drilling had been done to ensure that no abandoned mines or “drifts” threatened to destabilize the foundation of the future depot.  Indeed, the drilling had discovered solid limestone on average fifteen to twenty feet below the surface, and in some cases, even closer.  Already, some of the uneven parts of the Kansas City Bottoms had been filled by the railroads to allow future track to be on level with existing rails.

The site of the depot had once been the center of many mining attempts like the one above in the early days of Joplin, leaving many abandoned mines behind.

Six bids were submitted for the excavation, which required the removal of approximately 40,000 yards of dirt, and the Joplin firm Jennings & Jenkins was awarded the contract.   “I will begin work,” declared W. F. Jenkins on Saturday, April 2, 1910, “with a full crew on the excavation on Monday.”  Nine bids, two from Joplin area firms, were submitted for the construction of the depot structure.  However, the selection of the firm was considered more important than excavation, and demanded a meeting of the chief engineers of the Missouri, Kansas & Texas, the Santa Fe, and the Missouri and Northern Arkansas, railroads.  The architect, Louis Curtiss, available at the time of the bid announcement, promised that Joplin’s depot would be the most beautiful in construction, the most complete and convenient of any depot of the size in the United States.  Indeed, Curtis noted, specifications called for “handsome interior furnishings and the most substantial exterior known.”

On the following Monday morning, a small force of men with three to four teams of horses arrived and began the work of excavation.  The number of overall men expected to work varied from as little as fifty to four times that number, with as many four times the starting number of teams of horses.  Afterward, it was reported that before rain brought an end to the day’s labor that fifty men with fifteen teams had been brought to bear against the earth.

The delay in selecting a contractor to build the depot structure was not critical, as all reports stated that such construction could not begin until the grading was complete.  It was to be no small feat of work transforming the hilly area that offered a home to Joplin Creek into a suitable home for the new Joplin Depot.  In contrast to the 40,000 yards of dirt discussed earlier, Jennings & Jenkins instead claimed they only had to remove 30,000 yards of soil.  However, 135,000 yards of soil was required as fill, the present earth apparently being inappropriate for the task, and all of it to be hauled in by train.

The News Heraldsummarized the task ahead, “The hill along Broadway and Main street will be cut down and the dirt moved back onto the lower grounds.  These hills will be cut down to a level of the grades of the streets and the fill along the Kansas City Southern railroad will be made on level with the tracks…The hill north of the Old Joplin creek bed will also be cut down and the dirt hauled into the low places.”  Hills were not the only landmarks that needed cutting down, the paper referred almost in afterthought to, “Several buildings will have to be removed from the grounds during the next few days and a force of men will be set to work tearing them away and burning the rubbish.”  The several buildings were actually homes to “persons who have occupied houses on the site for many years who repeatedly within the past month have been ordered to move.”  No tolerance was given as the homes were to be destroyed as the excavation work approached them, not  even “if the occupants have not sought other quarters.”  The transformation of the Kansas City Bottoms was expected to take approximately two months.

Little of the old Kansas City Bottoms remains as it once was before the depot.

Only a few days after the start of the work, the excavators made a gruesome discovery three feet into the soil of the hill located along Broadway.  The Daily Globe reported, “The bones found are crumbled with age, and, although apparently whole when unearthed, fall to pieces when picked up; Their sizes are thought too large for small animals and too small for horses or cows, or other of the larger domestic beasts.”  Work came to a temporary stop as local residents were quizzed for knowledge of any remembered burials or graveyards.  None were recalled.  One such resident, who claimed to have prospected “all over the Kansas City Bottoms when a young man” had never heard of any burials.

The old prospector reminisced, “They might have been buried all right,” said he, “but it was not with the knowledge of the authorities or a permit from the coroner.  There was a killing down here almost every day in them times, and I suppose they had to bury the victims some way.”  The reporter of the Daily Globe noted that the majority of murders in the Bottoms were likely never reported, and the speculation that the excavators had discovered one unfortunate victim was very likely, an opinion shared by the Joplin police called to the scene.  However, the contractors “scoffed” at the idea, most likely out of fear of losing workers who, “showed unmistakable signs of nervousness when the discovery was made…Several declared they would not work if they were convinced they were digging up bones of human beings.”  Human remains or not, the excavation continued.

Another problem arose at approximately the same time as the excavators made their unpleasant discovery.  Nine bids had been submitted for the contract to build the depot structure and to the consternation of the railroads involved, all were considered too high.  The possibility of revising Curtiss’ design for the depot and re-opening the bidding process was proposed on April 8th.  Five days later, the decision was made to do so and bidding was opened again until the 18th.  The new bids were based on changes to the original design, contractor Fred Dieter reported, changes that “will not in any way effect the exterior nor the general plans for the building,” but rather consisted of, “a few substitutions in material.”

By the time the bidding process was closed, only six bids had been made, down three from the previous nine.  A. F. Rust, the chief engineer for the Kansas City Southern, promised that the new bids all appeared to be a much more satisfactory in estimated costs.  A week, the chief engineer promised, was as long as it would take for the winning bid to be selected.  Nearly two weeks later, on April 30th, an authoritative source promised that the winning bid would be announced in two days, in part to coincide with a meeting of the chief engineers of the four railroads which backed the union depot company.  By May 12th, James Edson, the president of the Kansas City Southern on a long distance telephone interview with a News Herald reporter, had to dismiss rumors that the depot was to be relocated to a 15th Street location.  In the same call, Edson declared that a meeting of the board of directors of the Joplin Depot Company in the later half of May would choose the winning contract.  Meanwhile, excavation continued with dynamite used to reduce a steep hill east of Main Street.
Joplin Union Depot
Finally, on June 5, a Sunday morning, it was announced that the Manhattan Construction Company of New York, with a branch office in Fort Smith, Arkansas, had been awarded the contract at an initial cost of $60,000.  Construction would begin, stated a representative for the company, no later than June 15.  The grading by the excavators was virtually completed, but the foundation of the building had not yet been begun.  The two city papers offered slightly different reports on the design of the building, the Herald claimed, “The trimmings will probably be of Carthage stone, according to the original plans,” along with brick and concrete, and the Daily Globe in turn stated, “The contract calls for the erection of a modern building, of reinforced concrete construction.”

Six days later, Rust visited the site of the future depot and promised again that the depot would be completed by the end of the year.  The chief engineer noted that already enough steel for four miles of track was at the site and that, “We intend to push operations as fast as possible,” and bragged, “only material of the highest grade will be put in the depot.  The station will be built with a view of accommodating Joplin when it is considerable larger than it is now.  In my opinion, and according to officers of the depot company, Joplin is one of the coming cities of the Southwest.”

By mid June, excavation work uncovered yet another discovery, zinc.  Within a week of the find, nearly a ton of the ore had been sold at a price of $23 a ton.  While the contractors considered applying the new found source of wealth toward the cost of construction, two men from the excavation crew were assigned to sort the soil. The quality of the ore was shortly considered rich enough that some of the men involved in its examination immediately organized a mining company, procured a lease to do the mining, and set upon the deposit.  The vein was found to be only a few feet beneath the soil, at least seven feet in depth, and in lieu of building a processing plant, the miners hauled away the dirt in wagons to nearby plants for processing to separate the zinc from the soil, as well any lead.  By August 4, the entrepreneurs had sold nearly $1,900 worth of lead and zinc, and were still at work at their enterprise.

A pile of processed "Jack" valued at $100,000.

The excavated area, located “near the heart of the old shallow diggings on Joplin creek” had once been the home of St. James hotel and also the “crimson lighted district.”   Old settlers, ever present to discuss such events, recalled the days when “the valley sloping off to the northeast resembled a bee hive.  Mines and miners were constantly working there.  Before many years had elapsed the ground looked like an overgrown pepper box.”  However, due to the presence of the hotel and other sordid activities, few thought to mine the area, or so the theory went.  The News Herald quipped, “If the owners of the new property do not see fit to construct their new depot they can mine.”

“Grading of site is nearly completed,” announced the Daily Globe, on June 16.  By the efforts of the excavators, the paper reported that “the hills to the north have been leveled, while many of the lower points have been filled and the surface rolled.”  Though, it took another four weeks to complete, the impact on the local geography was significant.  In addition to the annihilation of hills, the “surface of the ground has been lowered seven feet…in the higher places, and from that to two feet in the lowest parts.”  For the low parts of the depot area, fill was used to raise the surface from two to four feet.  Extreme summer heat, contractors claimed, was the culprit for the long delay in the completion of the excavation. The teams of excavators gone, the site absent of working men and horses, for a brief time was considered to possess an “absolute quiet.”

A visit to the site at the time would have revealed a number of temporary buildings built to house the materials needed to construct the depot.  The gathering of which had been ongoing for weeks.  Another significant addition, and alteration to the geography, was the culvert built to guide the waters of the Joplin creek under the Depot site.  When completed, the culvert was expected to be 631 feet long and possess a 6 foot radius.  Through it the creek named for the Methodist preacher, Harris Joplin, would eventually disappear from sight for a stretch of more than two football fields.  Nor was it the only effort to divert water, as a “great double aqueduct” was also being put into place to convey a stream from Main Street , built of concrete, it was two tubes each four feet in diameter and two hundred yards long.  When done, it was believed the aqueducts would be able to “convey a larger amount of water than has ever been seen in the little branch.”  The exit point for the aqueducts was in the area of the Kansas City southern bridge.

Off the site, at approximately the same time as excavation work was concluding, the Kansas City Southern filed a mortgage for the value of $500,000.  The mortgage was intended to secure the $500,000 in bonds that had previously been sold by the depot company to finance construction.  Nor was the Kansas City Southern the only railroad company involved with large sums of money.  The Missouri, Kansas & Texas, or Katy, Railroad was busy with the construction of a spur from its main line to reach the Depot at a cost of around $250,000.  Much of the cost had to do with traversing hollows and areas dotted with old mines and sludge ponds, which demanded the construction of bridges or the use of fill to stabilize the ground.  One such required bridge was to be located over Possum Hollow and would be a “22-panel pile trestle bridge” that would carry trains 47 feet above the floor of the ravine, and 30 feet above an existing bridge built by the Frisco Railroad.  Along with its own expense in the cost of terminals at the depot, it was estimated the Katy would ultimately spend $500,000.

While the Katy Railroad continued its investment into the depot, another railroad decided to investigate the possibility of joining the enterprise, the Frisco Railroad.  As covered earlier, the Frisco Railroad, through its interests in Joplin, had furiously attempted to stop passage of the union depot franchise by the city’s council.  However, almost two years had passed since its failed attempt and faced with a desire to expand its freight capabilities by the cheapest means necessary, the Frisco opted to further investigate the matter.  While the Frisco had a depot in Joplin, it believed that if it could direct its passenger traffic to the union depot, it could then enlarge its freight capabilities at the existing depot.  Despite reportedly being on of the largest landowners in the city of Joplin, the Frisco was having trouble parting Ralph Muir from the property he owned at the corner of 6th and Main Street, which it felt was needed were it to expand its passenger area.  The vice-president of the railroad, Carl Gray, promised a decision would be had in a couple weeks.  Ultimately, however, the Frisco did end up building a new depot, after it did finally acquired the coveted 6th Street and Main property.

The depot the Frisco later went on to built, still standing on Main Street Joplin today.

Meanwhile, as work concluded on the main excavation, on July 24, 1910, the Joplin Daily Globe, noted in a small article, far from the headlines of the front page, that the Manhattan Construction Company “Will Start Erection of Depot Tomorrow.”  Representatives of the company were to arrive on the 25th, along with a foreman, who’s task was to oversee approximately 25 men and the start of the foundation, which included the further excavation of fifty square feet for the new home of the depot’s heating apparatus.  The depot itself was finally under construction.

A History of the Joplin Union Depot – Part II

Our first installment of a history of the Joplin Union Depot covered the contentious debate between those for and against a franchise agreement offered by the Joplin Union Depot Company. Now we return to Mayor Jesse Osborne’s approval of the franchise and the long wait between approval and the start of construction.

On October 26, 1908, Mayor Osborne signed the franchise agreement after the City Council passed it with nearly a unanimous vote.  Osborne’s approval was definitely made more likely when City Engineer J.B. Hodgdon returned from a trip to Kansas City two days before with a contract signed by the president of the Kansas City Southern, J.A. Edson, promising to supply material for 324 feet of a viaduct.  As the Joplin Daily Globe noted, a viaduct was “Joplin’s dream,” for it would connect East Joplin with West Joplin.  Despite the union of the two towns of Murphysburg and Joplin into one town over thirty years before, there still existed a recognizable separation of the neighborhoods that lay on the west side of the Kansas City Bottoms and those which resided on the east side.  The viaduct would help erase these separate identities.  Thus, the assistance of the Kansas City Southern provided a great impetus for Osborne to sign the franchise agreement.

Guy Humes, later mayor of Joplin, but fierce opponent to the depot franchise passed by the City Council.

After the council had voted, but before Osborne had signed, the Joplin News Herald, one of the opponents to the franchise, went so far as to dedicate multiple columns to local attorney, Arthur E. Spencer, who claimed that the reaction of the Commercial Club (also an opponent to the franchise) was a reasonable one.  Among the arguments Spencer relied upon was an existing franchise agreement which did not have such a contested “reasonable facilities” clause. (See our prior post for more information on that clause).  For all the noise that the opponents of the franchise created, it was not enough.

“Every such accession makes for bigger values within the city of today, and makes for a bigger city of tomorrow,” stated Mayor Osborne upon signing the franchise.  The signing occurred despite a planned mass rally by Clay Gregory, the secretary of the Commercial Club.  The rally, reported the Globe, was called off when Gregory was chastised by two other members of the club.  It was the end of the opposition to the depot franchise.  What followed may be construed as a big wait.

This Joplin Globe article noted the exasperation that many felt with the opposition to the depot franchise, including that from the much maligned Clay Gregory, Secretary of the Commercial Club.

News of the Union Depot virtually fell out of the headlines of both Joplin newspapers until a front page headline nearly five months after Osborne’s approval of the franchise.  “WILL BEGIN WORK UPON UNION DEPOT WITHIN 30 DAYS, DECLARES EDSON,” announced the Globe.  The news came from Gilbert Barbee, a Democratic political power in Joplin, as well editor and owner of the Joplin Globe, who had traveled to Kansas City and claimed to have spoken with the Kansas City Southern president, Edson.  The claim initiated a brief spat between the Globe and the News Herald, which immediately set out to prove its rival wrong.

An editorial, published in the Globe, on April 4, 1909, summed up the dispute, which involved the News Herald sending its city editor to Kansas City to find contrary evidence to the news brought by Barbee.  The Globe then charged that the News Herald was and had remained opposed to the Union Depot for two damning reasons.  The first, that the newspaper wanted to “get on the roll” of James Campbell, whom the Globe labeled Joplin’s largest landowner and perhaps, Missouri’s richest man (and a large shareholder of the St. Louis & San Francisco “Frisco” Railroad).  Campbell had been labeled an opponent to the Union Depot project because he wanted to establish a new Frisco depot, which would be in competition with the other depot.  The second charge was that the individual who controlled the News Herald, unnamed by the Globe, but perhaps P.E. Burton, was actually a resident of Springfield and purposely used the “evening paper” as a means to vocalize against any improvement to Joplin.  More so then than today, Springfield and Joplin were rivals, each competing to become the larger metropolis in Southwest Missouri.  It was not beyond the vitriol of either populace to accuse the other of undermining their interests.

For all that the Globe had knocked its competitor for trying to undermine its claim, construction of the actual depot was still very far off.  However, preliminary work to prepare the Kansas City Bottoms was underway by late April.  One of the tasks deemed essential to a successful construction was the taming of the branch of the Joplin Creek which ran back and forth along the Bottoms.  The creek, one of the barriers that separated the east and west parts of the town, had a reputation for flooding the Bottoms after intense rains.  A representative from the Kansas City Southern was assigned the task of getting the permission of those who owned land (not owned by the Union Depot company) upon which the creek ran to change its course.  The plan was to straighten the creek along the bluff near Main Street.  By the time the representative departed, permission had been secured.  As a trip to the former Kansas City Bottoms today will attest, the plan was well carried out.

It was a belief, at least of the editors of the Joplin Globe, that Springfield actively sought to keep its rival Joplin from benefiting from any improvement which might make it more of a competitor.

The anticipation continued, however, as Joplin awaited news of the start of construction.  In May, 1909, former Missouri governor, David R. Francis, an investor in the depot, along with other investors, visited Joplin.  The former governor reassured the locals, and commented, “Plans for the depot are well in hand and arrangements are practically completed for work to begin soon.”  News on the depot, however, was scarce until August, when it was announced that the Missouri, Kansas & Texas Railroad, also known as the “Katy,” had agreed to join the Union Depot company.  This brought the number of railroads affiliated through the company to four: Kansas City Southern, Santa Fe, and Missouri & Northern Arkansas railroads, in addition to the Katy.

Additional news was the appropriation by the company of $200,000 for the construction of the station.  The appropriation came as engineers from the Kansas City Southern, directed by William H. Bush, completed surveys of the depot and station site.  The depot, Bush stated, was planned to be located near Broadway and Main, “situated 200 feet east of Main Street and the south line 150 feet north of Broadway.”  When quizzed on the status of the depot, Bush confirmed that the plans and specifications were completed, as well the architectural plans drawn up.  In a short time, assured Bush, the company would begin accepting bids from contractors.  As part of the preparation process, the Kansas City Bottoms would be filled in to make a proper rail yard.  As the engineer departed, it seemed that the building of the depot was not far behind.  Indeed, not long after, on August 17, engineers from the Katy railroad arrived to survey a spur that would take their railroad to the future depot.

Despite the build up, developments of the depot again drifted out of the newspapers.  In October, a fifth railroad, the Missouri Pacific railroad, expressed interest in joining the Union Depot company.  Then, for the next three months, news about the depot, its impending construction, vanished from the headlines.

The citizens of Joplin, as the months passed, grew anxious for news about their expected Union Depot, as depicted in this Joplin Globe cartoon.

The silence broke on the first day of February, with the News Herald taking its turn to offer a reported start time from a traveler to Kansas City.  The news came from a former Joplin resident, H.H. Haven, who passed on “reliable information” that work would begin soon.  The paper, which noted the long wait by beginning its article, “After months of inactivity…,”  brought forward the news that the cost of the depot construction had grown to anywhere from half a million to 700,000 dollars.  The station, itself, the paper noted was still expected to be about $40,000.  This figure was quickly upended by a report a few days later, based on information from the city engineer, Hodgdon, who was being tasked with overseeing the depot construction.

Hodgdon, in early February, was tasked with completing more survey work, specifically for the station itself.  The reported plans he worked from described a station that at some points was three stories high.  More incredibly, the estimated cost of the station had more than tripled to $150,000.  In terms of immediate work, the city engineer expected that a great number of men would be hired to grade the Kansas City Bottoms, filling in places that needed filling in, and other places required lowing.  A retaining wall was expected for the area near Main Street, as well.  In all, Hodgdon explained to a News Herald reporter, “there remains a big amount of engineering work to be accomplished before actual work on the station can commence.”

“$750,000 OF UNION DEPOT BONDS ARE SOLD,” loudly announced the Daily Globe, on February 12.  The bonds, issued at thirty-five years and 4.5% gold backed bond, had been sold to the George C. White, Jr. & Co., located in New York, as well the Pennsylvania Trust, Sate Deposit and Insurance Company.  Of the $750,000, $500,000 was to be put to immediate use in the construction of the depot.  The Globe also raised the figure for the station upward again to $280,000 and noted that plans for the station were complete.  The paper described the station as such, “the building proper will be constructed from brick and that it will contain ample waiting rooms,  adequate facilities for handling baggage, railroad and other offices.”

The signing of the depot franchise was considered a major victory for the administration of Mayor Jesse Osborne. Furthermore, it was viewed as victory for democracy. Note that Joplin here, unlike other political cartoons, is depicted as a miner.

Perhaps the most accurate timeline yet for depot construction was presented with the grading alone, which was to cost at least $50,000, to take at least eight months to complete.  The magnitude of the grading problem was made evident with the expectation that in some places, depths of as much six feet would need to be filled in.  Again, the overall cost of the depot was raised, now to an estimated million dollars.  The actual station and train sheds were expected to be finished by January 1, 1911.  While the million dollar price tag was impressive, the Connor Hotel, completed only a couple years earlier, had also a hefty expense.  The metropolitan Joplinites were growing use to expensive additions to their city.

Valentine’s Day in Joplin brought confirmation from Kansas City Southern president, Edson, that the project was assured with the successful sale of bonds.  Jesse Osborne, now former mayor (replaced ironically by the opposition councilman Guy Humes), declared, “The definite announcement that Joplin is to have the handsomest new union depot in the state in spite of the efforts of a narrow-minded faction to oppose the plan, marks an epoch in the history of this city.”

The day before, the Globe offered an editorial entitled, “Victory and Vindication.”  The opinion piece began, “This Union Depot is a betterment of such big and splendid utility, and a project of such substantial promise in many ways, that the people have endured delay and disappointment in a cheerful spirit.  Of the ultimate realization of the undertaking there has never been any honest doubt, though the influences which for political purposes, attempted to defeat the ordinance known as the Union Depot franchise have periodically striven to poison the public mind into thinking that this great public improvement was only a hazy, distant dream.”

The achievement of the union depot was seen as one of the top achievements by Joplin democracy, whereas the will of the people triumphed over the opposition of a well-funded minority opposition. It's presence was ranked with the Connor Hotel, the fantastic automotive fire department, and other improvements.

The piece was divided between praise for the reassurance brought by the sale of the bonds, and in typical inter-paper rivalry, prods at those who opposed the depot franchise, such as the News Herald.  In an earlier piece, the Globe had noted of James Campbell, the Frisco owner, that it would support Campbell in any quest to build a new Frisco depot in Joplin (rumors of which were plenty).  However, as victory was indeed within grasp, the paper took time to lambaste the current Frisco depot located at 6th Street in scathing terms, “One of the very prompt results of this Union Depot will be the passing of the imposition at Sixth street which the Frisco still presumes to call a depot.  We have been told with the pathetic trembling of lips that grieved at the confession of helplessness, that the sodden, barbarous inadequacy at Sixth street was permitted to remain because the Frisco didn’t have the money to build a better depot.”  More over, the Globe refused to accept “manifestly false absurdities,” and pointed to the millions spent by the railroad on its facilities in nearby Springfield.  In the haze of victory, with no little forgiveness for those who opposed the depot, the newspaper helped voice the frustration of a city impatient to continue its climb to greatness.

Two days later, the man who had helped to personally usher the franchise which bore his name, John Scullin, arrived in Joplin.  The agent of the Joplin Union Depot company recounted the delays which the company had encountered due to the opposition of what Scullin described as a “faction who handicapped the initial steps for the erection of a station.”  None the less, Scullin acknowledged that wiser heads prevailed, and promised the station would be completed by January 1, 1911.

The first view of the Union Depot which greeted the readers of the Joplin News Herald on March 1st

On March 1, 1910, the people of Joplin were offered their first glimpse of their future union depot.  Printed prominently across the top of the front page of the News Herald was an architect’s rendering of the front of the station.  Kansas City Southern chief engineer, A.F. Rust, introduced the building, “Louis Curtiss of Kansas City is the architect of the depot and we believe he has done well.  As you may notice, the middle section of the building is two stories high and on the second floor will be the offices.  At the right will be the baggage and express offices, while the east end will be occupied by the restaurant.”  Rust went on to add of the station, “The construction will be of concrete faced with stone.  Title will play a prominent part in the interior decorations, the mission effect being carried out in a happy fashion.  Entrance to the station from the rear will be from Main by a driveway that will circle at the back away from the trains.”  Rust finished his appraisal of the station with yet one more proposed cost for the station at $75,000.

The city now knew what to dream of, when it waited in anticipation for construction to begin and for what it hoped to be a boastful addition to their home at the start of the next year.  Between then and the station’s opening, a long road yet remained to be traveled.

Sources: Joplin News Herald, Joplin Daily Globe